Comprehensive transportation planning of Beijing new aviation city

北京新机场是国家级重点项目,未来将成为国际区域性航空枢纽门户。新机场临空经济区是依托机场空港的重要临空经济策源地,主导发展临空经济型产业并配套相应居住生活服务功能。新航城站位于新机场北侧,处于临空经济区先期启动区内。是新航城地区重要的交通枢纽,未来将成为站城一体化核心公共交通枢纽节点。

Beijing new airport is a national key project and will become an international regional aviation hub in the future. The airport economic zone of the new airport is an important source of airport economy relying on the airport, leading the development of airport economic industry and supporting the corresponding living service function. New-aviation-city station is located in the north of the new airport, in the early start-up area of the airport economic zone. It is an important transportation hub in new-aviation-city area and will become the core public transportation hub node ofnew-aviation-city integration in the future.

新航城站一体化开发不仅局限于站点周边土地,而应充分借助轨道交通先导力量,以车站为核心,全方位立体打造整体的站城地区形象。通过前瞻性的规划和政策引导实现交通与土地使用一体化,引导和保证新航城站实现高效、合理、特色鲜明开发目标。

The integrated development of new-aviation-city station is not limited to the land around the station, but should make full use of the leading force of rail transit, take the station as the core, and create the overall image of the new-aviation-city area in an all-round and three-dimensional way. Through forward-looking planning and policy guidance, the integration of transportation and land use can be realized, and the high-efficiency, reasonable and distinctive development goals can be achieved.

新航城站位于大礼路以南,是城际铁路与R4地铁交汇形成的枢纽站,站厅与站台均位于地面以下。地面按照目前的控规标识为绿化隔离带,未来拟结合枢纽站的功能在地面布局站外交通枢纽及相关功能开发,与地下站房形成交通枢纽综合体。同时该枢纽综合体也负责连接大礼路北侧的驿城与南侧的会展区,优化打造整个城市片区的一体化开发及交通便利性。

new-aviation-city station is located in the south of Dali road. It is a hub station formed by the intersection of intercity railway and R4 subway. The station hall and platform are located below the ground. According to the current regulatory regulations, the ground is identified as a green isolation belt. In the future, it is planned to combine the functions of the hub station to lay out the traffic hub outside the station on the ground and develop related functions, so as to form a traffic hub complex with the underground station buildings. At the same time, the hub complex is also responsible for connecting the post city on the north side of Dali road with the exhibition area on the south side, so as to optimize the integrated development and traffic convenience of the whole urban area.

Project Name

Comprehensive transportation planning of Beijing new aviation city

Type

Urban design + planning

Service

Planning

Site Area

N/A

Project Area

N/A

Time of design

2016

Status

Completed

2017

北京市优秀城乡规划设计奖/Beijing Excellent Urban and Rural Planning Award

KKL Partnership Architects

微信公众号